1.1.0.20 - Rebalancing of the track builders
Rebalancing of the track builders.. let us known what do you think... or if you will have any problems.

1.1.0.20

  • Large Re-balance of trackbuilders
  • Added Ya3 Heavy Steam Railcrane (1934)
  • Br80 track builder was added

You can find detailed list of changes there:
https://steamcommunity.com/app/784150/discussions/0/603041689184030182/
< >
Showing 1-15 of 34 comments
nice to have the new Trackbuilders, they will help alot :)
Track building so far was a bit of a grating experience, the glacial track building speed compared with everything else.

The Br80 (long) sure is quite something, definitely a most welcome change!
Thank you. They are working great.
Originally posted by Thomas:
Br80 doesn't have cargo visuals.
Seems to display cargo just fine:
https://steamcommunity.com/sharedfiles/filedetails/?id=3601747828

Might be not fully loaded in your case?
Thank you, been anticipating this week for week!!
Are there also other changes in the update? For some reason the game seems to run a little better for me, higher fps even when zooming out.
Is it something else/chance/placebo/imagination?
Check your RDO's stockpiles before dispatching the tracklayer. The screenshots show that the train only loaded 22 tons of materials, while its full load of gravel alone is 120 tons. That's why the sleepers aren't visible - there aren't enough of them.
Originally posted by melkij:
Check your RDO's stockpiles before dispatching the tracklayer. The screenshots show that the train only loaded 22 tons of materials, while its full load of gravel alone is 120 tons. That's why the sleepers aren't visible - there aren't enough of them.
Indeed, that's why I mentioned the train most likely not being loaded fully. One can observe the visuals turning to empty carts a bit before the track layer returns to the construction office.

It's definitely worth it to heavily push towards a dedicated train construction office and its worker pool with supplies being done by train as well. Especially during early start the trucks won't be able to keep up with supply.
Increasing the speed of track laying is a good thing. But now the logistics of the RCO are becoming a bottleneck. Either the track layer will be idle waiting for the storage to fill up, or it will be loaded to 10% and will make empty trips.
To achieve continuous 100% occupancy, we'll have to build a large RCO with large storage facilities, and add buffer storages with railways. Also RDO will have to be built nearby. No amount of trucks will be able to keep up with the full storage facilities.
I'm not sure if this is the right place to post this, but getting a repeatable ctd when I buy a track-layer. Specifically the moment when it starts to leave the border to go to the RCO.

EDIT: It did not crash with the LTC, but did with the other 3 1930 track-layers.
Originally posted by keng:
Increasing the speed of track laying is a good thing. But now the logistics of the RCO are becoming a bottleneck. Either the track layer will be idle waiting for the storage to fill up, or it will be loaded to 10% and will make empty trips.
To achieve continuous 100% occupancy, we'll have to build a large RCO with large storage facilities, and add buffer storages with railways. Also RDO will have to be built nearby. No amount of trucks will be able to keep up with the full storage facilities.

Yeah, there's no need in trucks to supply an RCO. In my republic a small RCO with all storages connected is perfectly fine supporting long track layers. Storage facilities are supplied by trains of course.
Originally posted by melkij:
Check your RDO's stockpiles before dispatching the tracklayer. The screenshots show that the train only loaded 22 tons of materials, while its full load of gravel alone is 120 tons. That's why the sleepers aren't visible - there aren't enough of them.
https://images.steamusercontent.com/ugc/9223719616166325286/0941E8550F3F4CC67D2DD73EBEB1CF6B133BF7BD/?imw=5000&imh=5000&ima=fit&impolicy=Letterbox&imcolor=%23000000&letterbox=false

RDO stockpiles

https://images.steamusercontent.com/ugc/13887496368186008321/C4D0B124B1AE407EE4331774F3B568ED1BB24BED/?imw=5000&imh=5000&ima=fit&impolicy=Letterbox&imcolor=%23000000&letterbox=false

LOL. You are right. I guess storage can push limited amount of gravel without tower engine . Thanks.
i was waiting for this update since sirius mention it, will test them today
Originally posted by Thomas:
LOL. You are right. I guess storage can push limited amount of gravel without tower engine . Thanks.
Yeah, even the EDK-300 before the update wasn't fully loaded because this small RDO didn't take enough gravel through passive conveyor.
Originally posted by melkij:
Originally posted by Thomas:
LOL. You are right. I guess storage can push limited amount of gravel without tower engine . Thanks.
Yeah, even the EDK-300 before the update wasn't fully loaded because this small RDO didn't take enough gravel through passive conveyor.
Here is my new set up. Works great .

https://images.steamusercontent.com/ugc/9368748311025739175/022CB89CA310EED947394E22E9B07B195A5E5AB6/?imw=5000&imh=5000&ima=fit&impolicy=Letterbox&imcolor=%23000000&letterbox=false
It's quite amazing how well the track building speed ties into the game now, with the improved track builders.

Now you can throw workers at it and with proper supplying of the rail construction office it's a breeze.

https://steamcommunity.com/sharedfiles/filedetails/?id=3604237286

https://steamcommunity.com/sharedfiles/filedetails/?id=3604237377

I've only noticed that materials can overfill the small construction office when the track builder returns, which could prevent other materials to have space (usually bricks fill the storage when building bridges, making steel, boards and prefabs have no more space).
Haven't seen this with the large 8 slot buildings yet.

No other issues so far.
< >