New cableway slowdown mechanic/penalty
After checking it out in 9.1.4 the slowdown-per-car effect has been removed but there does appear to be a new "total weight penalty" on excessively long cable lines. I have a near 4km trash cableway running down a mountain which drops from 10 m/s to 4 m/s when under load (up to ~160t).

https://steamcommunity.com/sharedfiles/filedetails/?id=3267987845

From sandbox experiments the penalty begins at ~68t for 2 small stations, ~104t for 1 big 1 small, and ~140t for 2 big stations.

Basically if "Weight of system" exceeds (200t ÷ Engine power MW) the cableway slows down. This penalty appears to be exponentially decaying so the speed never hits 0.

I'm not necessarily opposed to this change but it's going to make aggregate and waste cableways (4.7t and 4.5t cars respectively) significantly more difficult unless we can get some sort of gravity assistance.
< >
Showing 1-8 of 8 comments
Yep, cableways have been nerfed, which is too bad because they were in a good spot earlier.
You can kind of get them back to how they were by editing their config files; increasing the $ENGINE_SPEED tag value raises the engine power, which allows them to move more weight at "high" speed.
Editing the $ENGINE_SPEED value affects every station (of that size and type) across the whole map. For my save this creates a cascade of power failures at all corners of the republic since cableway stations consume significantly more power than their

It's not an impossible obstacle to overcome but it will be a massive pain in the rear to break-up the cableways into shorter segments and straighten out the towers.
Another round of changes in 0.9.1.7
Originally posted by 3division:
  • Tweaked cableway consumption and speed.
After testing I can confirm that the cableways are working at their old throughputs again, with the main difference being that you pretty much need the larger stations for long heavy cableways.
Originally posted by melkij:
Another round of changes in 0.9.1.7
Originally posted by 3division:
  • Tweaked cableway consumption and speed.

Originally posted by Silent_Shadow:
After testing I can confirm that the cableways are working at their old throughputs again, with the main difference being that you pretty much need the larger stations for long heavy cableways.

Post public 1.0.0 versions have raised the limit from 200t/MW to 250t/MW, while also increasing big cableway station power to 0.45MW (0.6 for big aggregate).

While not at pre-nerf levels it's much easier to get around the penalty with big stations and breaking lines beyond
e.g. 2 small cableway stations can handle a 1600m line, running fully loaded heavy garbage cars (one way) just barely under the penalty-free limit of 85t.

If I've done the math right you would need a 4000m long line before you exceed the limit for 2 big cableway stations. At that point you should really just use a train.
Originally posted by SimoGlass:
Originally posted by melkij:
Another round of changes in 0.9.1.7

Originally posted by Silent_Shadow:
After testing I can confirm that the cableways are working at their old throughputs again, with the main difference being that you pretty much need the larger stations for long heavy cableways.

Post public 1.0.0 versions have raised the limit from 200t/MW to 250t/MW, while also increasing big cableway station power to 0.45MW (0.6 for big aggregate).

While not at pre-nerf levels it's much easier to get around the penalty with big stations and breaking lines beyond 2000m
e.g. 2 small cableway stations can handle a 1600m line, running fully loaded heavy garbage cars (one way) just barely under the penalty-free limit of 85t.

If I've done the math right you would need a 4000m long line before you exceed the limit for 2 big cableway stations. At that point you should really just use a train.
I think 3 or 4km is the max cable lenght anyway.
So that should work out without to much trouble.
3.5 km is the current limit, so yeah.

Originally posted by SimoGlass:
At that point you should really just use a train.
Depends on the throughput you need, but generally a cableway will be more cost effective. Railways are much more space efficient for throughputs over 120 tons/day or so.
< >