Does anyone know how to increase the number of foreign workers present at customs?
I stopped playing a couple of months ago because I wanted to start a new project in realistic mode, but honestly I abandoned it because I wanted to do something from scratch without workers/few workers, so I'm wondering if anyone knows how to increase etc etc
< >
Showing 1-11 of 11 comments
In my experience the number quickly rises as soon as you start to collect and employ them, so far never had problems to get the needed numbers.
Originally posted by 4X-Fan:
In my experience the number quickly rises as soon as you start to collect and employ them, so far never had problems to get the needed numbers.

I honestly always have difficulty in having workers at the beginning, because a 1km street is finished in 2 years with all the means.
Originally posted by luigi940:
I honestly always have difficulty in having workers at the beginning, because a 1km street is finished in 2 years with all the means.

I would recommend to use construction vehicles for building streets - workers take fairly long and are more expensive. They are mandatory for very short segments (but then a few are enough), but for longer stretches excavators and/or bulldozers do a better job.
The more you use them, the more of them there are - approximately 140-150 is reachable number of waiting guys at the same time.

But as someone wrote it - those workers are not meant to be used on roads unless absolutely necessary. A simple buldozer is effective as 28 workers per shift (level = number of workers equal to it). Only use workers to do jobs they are actually needed for.

Also using road cranes (cheap ones are ok) helps tremendously in costructing buildings - each crane has a level as well and each level represents the number of workers this crane can give bonus to; and that bonus is equal aroung 5,5x multiplier. So basicall two microbuses, each of 8 workers, supplied by basic lvl23 roadcrane will do the amount of workdays equal to 16x5,5 = 88 workdays. This is massive for the cost of few workers.

Now again - plan well, stop using autosearch of everything for everything, plan a little (a bit of micromanagement at the start is not that hard with grouping of COs into assigniment tabs accesible via hotkey if you´d like) and you can have a city in a year suitable for moving in citizens in spring 1961.

How it looks like irl you can see it in my playthrough here. Lots of inspiration you can find there ;)
https://youtu.be/kgptw4hq6C8?si=J9MBWpqnRtl0RdW-&t=387
Originally posted by Sirius Czech:
A simple buldozer is effective as 28 workers per shift (level = number of workers equal to it).
Moreover, 28 workers with 100% efficiency. At the same time, each foreign worker has different efficiency. In my opinion, it is rare that it is higher than 100, that is, for the same efficiency of one bulldozer, even more foreign workers are needed.

If a long road is needed faster, build a dirt road parallel to it, then connect the roads in the center. This way, several bulldozers can work in parallel. But gravel is delivered less efficiently.
foreign workers may have different efficiency, but in general I found out that they DO work for 1 workday per day in general (easily provable by for example needing 11 workdays to finish a small roadpiece and after a van of 8 foreigners you are stuck with remaining 3-4 days (because rounding), but not 5 or 6 as your post would suggest
If building a tarmac road that will take ages. Build gravel so you can progress the game. Then later complete tarmac. Careful to build bypass where possible so vehicles can still move.
I simply use 8 x 4 pads of helicopter contruction blimps, passenger, open , aggegate and concrete, and use western and eastern customs,

Or just build helipads into stockpiles near where the blimps are stored
Originally posted by petercoopsey:
If building a tarmac road that will take ages. Build gravel so you can progress the game. Then later complete tarmac. Careful to build bypass where possible so vehicles can still move.

For me it is not an option because it would be like doing double work, the paved road is only the unfinished process of the option that you give me, I still maintain that the number of foreign workers should be increased.
Originally posted by T600_Mod:
I simply use 8 x 4 pads of helicopter contruction blimps, passenger, open , aggegate and concrete, and use western and eastern customs,

Or just build helipads into stockpiles near where the blimps are stored

Well let's say I use a similar system, but the problem will always be the labor at the beginning.
Originally posted by luigi940:
For me it is not an option because it would be like doing double work, the paved road is only the unfinished process of the option that you give me, I still maintain that the number of foreign workers should be increased.
That is not a double work. Gravel road is a base for prefab/asphalt roads anyway and as such is the perfect precursor. Also vehicles in 1960s can hardly exceed 60 km/h speed much (basic Skoda trucks are going 65 km/h), so it is perfectly ok to start with gravel roads only and upgrade them later.

Dividing roads in sections of few hundred meters at most is the best way to modernise a road. Temporary parallel dirt road can be erected in such case to not disrupt the flow of traffic; highways are best built in doubledirt -> one gravel -> second asphalt -> both asphalt stages.

Anyway, none of this is related to workforce amount anyways, because besides bridges, tunnels and streets with lamps (an unnecessary luxury at the beginning) you do not need ANY workers to work on such projects except really short pieces (<10m path, <20m road and FC).

This seems more like a problem of not using the right tool for the right job then a game problem. And solution is always sitting in front of your monitor, not on its screen.
< >