Workers & Resources: Soviet Republic

Workers & Resources: Soviet Republic

View Stats:
No construction office have path
For some reason my construction offices refuses to build my underground sewage pipeline past a point. Ive built mudroads ontop, just beside, along the entire pipeline and nothing. They had no issue building the first 100m ish from the main road and the last part to the sewage discharge, but refused to build on to the rest, even with mud roads ontop as Ive said.

"No construction office have a path to this construction"
You want me to build a tunnel down to the pipeline for you? I dont understand what the issue is. And yes the mudroads are connected to the road network.

At the discharge they built the pipe to the first pump but not the pump literally 10m from the road.
Originally posted by ling.speed:
Connection to constructions of pipes, cables, factory connections etc can only be done from a place that has vehicle access through road or pedestrian path.
Building providing the access does not have to be finshed, it can be just a plan. It also does not need to be anywhere close, only thing matter is continous connection of plans to it.

Few things could be happening here, first the easy ones:
1) Lack of path to the building the pipe connects to.
2) Sometime (usually due to length) pipe is broken down into two sections in which case both sides need to have connection through a building.

3) It can happen that pipe is broken down in multiple sections so pipe in the middle has no access. In which case soultion is to go to "terrain tools" and pick "connect two pieces" tool and click on the brakepoints to create one big pipe. (this works only on plans)
4) What if you already built the pipes that could have been laid? The game has a mechanic that auto connects constructions so it should not prevent continuing pipe laying normally, but sometimes it can brake. Where you will need to remove part of the planned pipe thats connected to created pipe and re-connect it, this should refresh the connection logic.
4a) if the pipes are still not accessible, apply solution from 3) to the now re-connected plans.
< >
Showing 1-6 of 6 comments
To have access to your underground sewage pipes, COs need road access to the pipe outlets.

Are you positive the pipe section that causes issues is connected via pipe to the discharge or switch or outlet? Can you show us a screenshot of the whole deal?

it can be easy sometimes when zoomed out to think you've connected a piece of pipe and it's actually just close but not connected because of snapping or other issues.
The author of this thread has indicated that this post answers the original topic.
Connection to constructions of pipes, cables, factory connections etc can only be done from a place that has vehicle access through road or pedestrian path.
Building providing the access does not have to be finshed, it can be just a plan. It also does not need to be anywhere close, only thing matter is continous connection of plans to it.

Few things could be happening here, first the easy ones:
1) Lack of path to the building the pipe connects to.
2) Sometime (usually due to length) pipe is broken down into two sections in which case both sides need to have connection through a building.

3) It can happen that pipe is broken down in multiple sections so pipe in the middle has no access. In which case soultion is to go to "terrain tools" and pick "connect two pieces" tool and click on the brakepoints to create one big pipe. (this works only on plans)
4) What if you already built the pipes that could have been laid? The game has a mechanic that auto connects constructions so it should not prevent continuing pipe laying normally, but sometimes it can brake. Where you will need to remove part of the planned pipe thats connected to created pipe and re-connect it, this should refresh the connection logic.
4a) if the pipes are still not accessible, apply solution from 3) to the now re-connected plans.
I see.. I didnt connect the footpath. welp
Originally posted by bagger:
I see.. I didnt connect the footpath. welp

Two other things to watch for:

The footpath may be under construction, and a footpath under construction looks very similar to a mud foot path.

And secondly a specific construction office supplying a critical component may be out of range while all others are fine.
< >
Showing 1-6 of 6 comments
Per page: 1530 50