Maintenance - Low worker amount intended?
I've always wondered why construction offices barely pick up any workers for maintenance. For regular buildings there's rarely a dozen workers sent to the maintenance sites by the COs, despite having plenty of workforce and busses available.

Now I managed to see the refinery entering building maintenance and got even more puzzled:
https://steamcommunity.com/sharedfiles/filedetails/?id=3815204004

The maintenance process allowed for a whopping 1107 workers (in total of 3321 workers for all 3 shifts!), yet, despite the labor pickup hall being filled to the brim with 200 workers, the 38 passenger T23 bus is ordered by the CO to only pick up 7% (2.44 workers) for some reason, despite the remaining time for the maintenance of the refinery being 329 workdays.

All resources were already on site, same for the mechanisms.

Am I missing something here, doesn't seem to be intentional for it to be this way, artificially prolonging the maintenance with a strangely low worker load.

There were never more than 50-60 workers (roughly 5% of the listed 1107 work slots) at the construction site despite having plenty of busses and workers available.

Anyone with some more insight on this? Would this be worth a bug report?
< >
Showing 1-6 of 6 comments
Interesting question, i always wondered the same.
Did the CO calculate that this number of workers (plus the bonus speed from the cranes) would be enough to complete the operation in one day? A total of 329 working days remains.

Standard CO tasks follows a certain logic here: you don't want to bring in a full busload of workers when only the finishing touches remain.
Originally posted by melkij:
Did the CO calculate that this number of workers (plus the bonus speed from the cranes) would be enough to complete the operation in one day? A total of 329 working days remains.

I'd be surprised if that was the case tbh, i don't remember the last time the C.O managed to reconstruct an entire large building in a day even if everything was set for it to happen.

Originally posted by melkij:

Standard CO tasks follows a certain logic here: you don't want to bring in a full busload of workers when only the finishing touches remain.

Yeah that part is always true though but it doesn't seem to be the case here
The "new" CO logic seems to only bring enough workers as needed to complete the current phase. 329 workdays ÷ 5.5 (the crane multiplier) = ~60 workdays of work required to finish, so assuming each worker could do 1 workday, that's roughly how many workers are needed at this point.

It might also be a case where the CO doesn't want to bring more workers than the cranes can support, but I haven't messed around with reconstructions enough to know for sure.
Originally posted by melkij:
Standard CO tasks follows a certain logic here: you don't want to bring in a full busload of workers when only the finishing touches remain.

I wouldn't say that is always true. I had an example where I had a Sewage Discharge with a really low number or workdays remaining (single digits), and a horse crane on site. For whatever reason the worker construction offices decided to send two full twenty-seater passenger transports (of foreign workers) to finish the job. By the time the second bus got there, the job was already completed...

There's been concrete bridges built where the worker CO's send way more workers to complete the first concrete phase, only to have the rest stand around waiting for the Concrete trucks to ship more concrete to the site.

This has all been early game. What I'd be curious about is if the free CO's have the same logic as the CO's you have to build. I wonder if that's been the issue, like the large customs houses got better vehicle pathing, while the small and mediums still bottleneck with more than two vehicles at a time.
Originally posted by Silent_Shadow:
The "new" CO logic seems to only bring enough workers as needed to complete the current phase. 329 workdays ÷ 5.5 (the crane multiplier) = ~60 workdays of work required to finish, so assuming each worker could do 1 workday, that's roughly how many workers are needed at this point.

Was the old CO logic different in that regard? Not that I want to go back to those days of trucks being forced to return to the CO after every delivery instead of now re-evaluating for new jobs when going over road nodes (if I remember correctly), some things definitely had its pros, like asphalt paving utilizing every CO truck, instead of only 2-3 per road construction site.

Definitely makes sense with the crane multiplier. Maybe the intent is to maximize each workers workday timer?

Originally posted by Silent_Shadow:
It might also be a case where the CO doesn't want to bring more workers than the cranes can support, but I haven't messed around with reconstructions enough to know for sure.
Could be, hard to tell since I'm frequently restarting before reaching the 50s with the first "bigger" tower cranes coming out in 1945-1946. Always a big boy pants moment for the COs, heh.

Originally posted by Kaia:
I'd be surprised if that was the case tbh, i don't remember the last time the C.O managed to reconstruct an entire large building in a day even if everything was set for it to happen.
I think I recall having ~900 construction workers at a nuclear power plant construction site around the 1980s in a playthrough a good while back. Busses were still arriving with the construction within 200-300 workdays of being completed and last phase. Seems like maintenance works different.

Originally posted by SBGaming:
There's been concrete bridges built where the worker CO's send way more workers to complete the first concrete phase, only to have the rest stand around waiting for the Concrete trucks to ship more concrete to the site.
I've seen this too, also when switching from construction phases (groundworks with gravel, concrete and excavators having 100+ workers when finishing, changing into brick laying or what have you where busses still deliver workers while crane and bricks are on their way).
< >