Trackbuilder stops at 78%
Hello everyone!

I'm playing a map on realistic mode. I'm building my railroad system and I've been noticing that my trackbuilder keeps stopping to work at exactly 78% of the rail patch (regardless of its length) and goes back to base, then comes back and finishes the rest of that patch and back to base again, and then it comes to start the next patch.

I'm seeing that the trackbuilder still have resources and the railroad construction office still have workers. It happens with both the AGMu and the EDK-300 on every single patch of rail I'm building.

This is having a huge impact as it is delaying the construction by a lot.
Is this a bug? Or am I missing something? Any ideas on how to fix it?

Thanks for any guidance!
Originally posted by GrumpyOldMan:
Building electrical train tracks are a bit of a beginner trap.

As you figured, if you directly build electrical tracks, they can only be built in segments. First the tracks, then the upgrade to electric.

What you need to do, to get them built in one go, is to lay down the basic track first, then, once built, upgrade to electrical.

Same goes for early start wooden track to wooden electrical.

There's also no way to upgrade wooden electrical to concrete electrical either (at least last time I checked), better to hold out until concrete tracks become available in that case.
< >
Showing 1-9 of 9 comments
Ah I think I found a possible culprit. I'm building electrified railway and the 78% matches the end of the first phase "laying railway" and the start of the second phase "wiring installation". Still, why can't it do it straight? I'm seeing the trackbuilder going back with materials still on board (visually at least).
The author of this thread has indicated that this post answers the original topic.
Building electrical train tracks are a bit of a beginner trap.

As you figured, if you directly build electrical tracks, they can only be built in segments. First the tracks, then the upgrade to electric.

What you need to do, to get them built in one go, is to lay down the basic track first, then, once built, upgrade to electrical.

Same goes for early start wooden track to wooden electrical.

There's also no way to upgrade wooden electrical to concrete electrical either (at least last time I checked), better to hold out until concrete tracks become available in that case.
That is indeed a good tip, laying the regular version first all at once, and then upgrade the whole thing to electric. Every mistake, a new learning I guess. Thanks!
The system is generally a bit weird and building either long sections first and adding switches in later, or building non electrified rail first and then upgrading does the trick. Interesting side note on upgrading: If you upgrade non electrified track with wooden sleepers to el. rail with concrete sleepers, the track builder can do both upgrades (track and catenary) in one go if it started its journey with the items for building catenary...
For Metros on the other hand it all works in one go...
Really? That is unexpected, thanks for the tip!

Although, I have to admit, it feels weird to me that it has to do two go around to build the electrified version from scratch. I think it was an oversight that making it work in two phases would have these consequences. Anyway, thanks for the information sharing!
Originally posted by GrumpyOldMan:

There's also no way to upgrade wooden electrical to concrete electrical either (at least last time I checked), better to hold out until concrete tracks become available in that case.

You do have to go over twice when doing concrete over wood, but the cost is less. Save on gravel and maybe something else.
Originally posted by TNT:
Originally posted by GrumpyOldMan:

There's also no way to upgrade wooden electrical to concrete electrical either (at least last time I checked), better to hold out until concrete tracks become available in that case.

You do have to go over twice when doing concrete over wood, but the cost is less. Save on gravel and maybe something else.

You pay for gravel comrade? Noted and appropriate parties notified.
Some, yeah, but not all. It is not the full price. Check it out. Actually, if you have electric wood and go to electric concrete, there is no gravel charge for the "upgrade" (not really an upgrade tho).
Originally posted by Orixim:
Really? That is unexpected, thanks for the tip!

Although, I have to admit, it feels weird to me that it has to do two go around to build the electrified version from scratch. I think it was an oversight that making it work in two phases would have these consequences. Anyway, thanks for the information sharing!

Pretty sure its not intended. Track building was in the game afair right from the start and wooden tracks only just arrived with the early start DLC. I think whats happening is that it takes the ressources it needs on its journey, and since the run for adding catenary also means its already got everything on board for upgrading wooden sleepers to concrete the game doesn't send it back...
< >