How to manage waste with Train Distribution Office
Hello everyone!

I would like to hear how each one of you manages your waste (realistic mode), since I am feeling very frustrated with this particular system. I'm probably missing something here.

Let me say what I was trying to do and the problems I'm facing:

I've built a waste separation and recycling zone. The waste would be delivered by train into a `Dump with claw machine (railway)` that I set to store Fertilizer (to avoid having waste generating pollution) and I've connected it to multiple `Transfer for big garbage containers (large)`. One is set to Hazardous Waste and then connected to my `Waste Treatment Plant`; Another is set to Mixed Waste, which connects to the start of the separation chain (`Steel recycling Plant`) and to the `Waste Treatment Plant` to collect its output; Another is set to Biological Waster, which is then connected to the `Composting plant` to transform it into fertilizer, which in turn is connected to the Mixed Waste of the start of the chain and to another `Transfer for big garbage containers (large)` to output the Fertilizer and this one is also connected to the same `Dump with claw machine (railway)`; and the last `Transfer for big garbage containers (large)` is set to all the remaining waste types that might be arriving already sorted and won't be pulled through the chain (I have a truck distribution office taking those containers directly to the appropirate recycling plants).

Then, in each of my towns / industry zones, I have a `Dump with claw machine (railway)` (which I set to store fertilizer to avoid having garbage causing pollution in my town) connected to one or more `Transfer for big garbage containers (large)` set to the existing garbage types in that zone and a technical office collecting from the garbage stands and bring it there.

Lastly, I have my `Train Distribution Office` set to collect all garbage from my towns/industries to the waste treatment zone.

In my head this was perfect, when I've done it, it doesn't work at all. Apparently, the `Train Distribution Office` can only manage whatever is stored in the `Dump with claw machine (railway)` and not on the connected `Transfer for big garbage containers (large)`. This is a huge headache, since I can only store one type of garbage in it while the other types would be ignored. Then I tried using train lines instead with wait until full. That is also a problem, because I either not set which wagon waste type to collect and for some reason the game starts filling them all with one type and then they hang half filled while the remaining waste is not loaded and the truck never gets fully loaded neither. If I set the waste type myself, I would have to guess exactly the right amount of waste of each type is being generated. My last resort solution was to use a train for each waste type and make that train visit every zone and then dump on waste treatment zone, which kinda works but makes my trains travel a lot needlessly if that waste type is not that common.

One final note for a super weird behavior I found on the fertilizer. While the `Train Distribution Office` worked if I put trucks taking the fertilizer from the `Transfer for big garbage containers (large)` to the `Dump with claw machine (railway)`, the train would actually only load from the dump itself or from the factory production in realtime and never from the `Transfer for big garbage containers (large)` that actually bridges the two.

Screenshot[ibb.co]

So, anyway, how do you handle your waste? Do you know how I can fix my system?

Thanks!
< >
Showing 1-9 of 9 comments
Originally posted by Orixim:
Hello everyone!

[...]

So, anyway, how do you handle your waste? Do you know how I can fix my system?

Thanks!
Hello Orixim,

I don't use train anymore for waste. I tried, but it never satisfied me. I use only trucks.

My logic is quite simple. I have waste collectors that store waste into local waste transferts. Usualy, one waste transfert by waste collector, but I can set two collectors into the same waste transfert sometimes, when I know there will be few waste collected.

Then, I set somes separation plants connected to power plant incinerators. With a bunch of big distribution offices nearby. Those get mixed waste from many waste transferts and separate it. Then burn the residual mixed waste. One of those, usualy the first I build, is connected to a treatement plant that get and cleanup all my republic toxic waste.

Then I have specialized places that treat aluminium scrap, plastic waste and steel scrap. With a few distribution offices to get matrerial from all my republic, and dispatch the recuperate products.

Last, I have some bio dumps with distribution office to collect and transform bio waste into fertilizer. I usualky set those close to farms.

If you have not too far mixed waste separation and incinerators, trucks are enought to transport it. And if your republic is not too large, toxic, aluminium, plastic and steel are low enought to be transported by trucks wherever you set it.

I forgot to say that I always pair a gravel recycling with any gravel processing plant to treat directly construction waste.

The mixed, bio and construction waste are the only one that are produce in great quantity. Construction waste is mainly generated by mines, bio is more dispatched, but most is produced by livestock. And mixed can be treated localy.

NoirDelire

PS: cableways are cool for short distance waste transfert.
I've given up on centralizing waste management. It always melts down on capacity and throughput issues so I can't tell you how to fix yours. Here's what I do:

Pull out the construction waste and metal scraps at source. Metal scraps are worth recycling. Construction waste is not, except to reduce the volume. I either recycle mine and put it through the chemical plant, or take it by train to an aggregate harbor to export. Each industrial area has an incinerator where the mixed waste goes. You can either put the hazardous waste through the incinerator or run it through a treatment plant first. If you incinerate hazardous waste, put it through a transfer station. Incinerators preferentially burn mixed waste so the hazardous waste may need a spot to stockpile until the incinerator runs out of mixed waste to burn. Adjacent residential areas use these incinerators as well.

The incinerator ash goes in a railway claw dump. From there waste trains take it to a port with another claw dump and mod waste harbor. A mod waste freighter exports it. These load quickly because they are mods designed to do so. I refuse to set my ash out in multiple dumps to slowly blow away.
Originally posted by Delmon:
[...]

The incinerator ash goes in a railway claw dump. From there waste trains take it to a port with another claw dump and mod waste harbor. A mod waste freighter exports it. These load quickly because they are mods designed to do so. I refuse to set my ash out in multiple dumps to slowly blow away.
You can get ride of ash by dispatching them. If you set up a bunch of small dumps where you put ashes, it will slowly disapears. No need to transport it far away.

NoirDelire
Originally posted by Orixim:
I've built a waste separation and recycling zone. The waste would be delivered by train into a `Dump with claw machine (railway)` that I set to store Fertilizer (to avoid having waste generating pollution) and I've connected it to multiple `Transfer for big garbage containers (large)`.
Only the collection stands for waste (large and small bins) do not pollute unless overflowing. Waste transfer stations do indeed pollute, so you might be complicating stuff unnecessarily. Not sure about construction waste, metal or aluminium scrap, doubt they'll pollute, don't quote me on that though.

For towns I never had an issue with waste pollution with the transfer station being ~500m from the nearest residential / tourist building.

You want it to be empty most of the time, just have your collecting trucks drop off local waste (usually small bin trucks for towns) and have a road distribution office with big bin trucks to haul it away.

Hazardous waste can be simply hauled to any nearby incinerator by truck, since it's generated at a slow rate, collection by train would just be overkill.

Rail distribution office also seems an odd choice to handle waste, since waste sitting in railway garbage dumps / waste transfer stations will emit pollution. I've had good success with a collection train on a line for mixed waste.

In some cases you can burn mixed or hazardous waste without any leftovers (refinery comes to mind), which makes it ideal to locally burn the waste so it turns to 100% ash mixed waste and will dissipate over time. Had a refinery run for ~30 years in my last game, with the ash dump being almost empty despite the refinery running at ~85-90% productivity 24/7.

Also note that the railway waste dump with crane will load only 4 waggons at once, seems to be an exception since every other station will simultaneously load an amount of waggons depending on station and waggon length (waggon length divided with station length and the result rounded down will give you the amount of waggons loaded at the same time if I remember correctly).
The way I have set up my waste system is there is local waste collection, so the rubbish truck's actually collecting waste from the bins, travel the shortest distance around the city, and immediately drop off at waste storage right next to the city. Trains pick up this waste from the waste city and take it to my horribly over-engineered waste separation and processing facility. Keep it that simple.

Alternatively, if you're using trucks, still tell your waste collection trucks to collect waste and immediately deposit at a storage right next to the city. Then use your distribution office to move this waste using large skip trucks.
Originally posted by Orixim:
Hello everyone!

I would like to hear how each one of you manages your waste (realistic mode), since I am feeling very frustrated with this particular system. I'm probably missing something here.

Let me say what I was trying to do and the problems I'm facing:

I've built a waste separation and recycling zone. The waste would be delivered by train into a `Dump with claw machine (railway)` that I set to store Fertilizer (to avoid having waste generating pollution) and I've connected it to multiple `Transfer for big garbage containers (large)`. One is set to Hazardous Waste and then connected to my `Waste Treatment Plant`; Another is set to Mixed Waste, which connects to the start of the separation chain (`Steel recycling Plant`) and to the `Waste Treatment Plant` to collect its output; Another is set to Biological Waster, which is then connected to the `Composting plant` to transform it into fertilizer, which in turn is connected to the Mixed Waste of the start of the chain and to another `Transfer for big garbage containers (large)` to output the Fertilizer and this one is also connected to the same `Dump with claw machine (railway)`; and the last `Transfer for big garbage containers (large)` is set to all the remaining waste types that might be arriving already sorted and won't be pulled through the chain (I have a truck distribution office taking those containers directly to the appropirate recycling plants).

Then, in each of my towns / industry zones, I have a `Dump with claw machine (railway)` (which I set to store fertilizer to avoid having garbage causing pollution in my town) connected to one or more `Transfer for big garbage containers (large)` set to the existing garbage types in that zone and a technical office collecting from the garbage stands and bring it there.

Lastly, I have my `Train Distribution Office` set to collect all garbage from my towns/industries to the waste treatment zone.

In my head this was perfect, when I've done it, it doesn't work at all. Apparently, the `Train Distribution Office` can only manage whatever is stored in the `Dump with claw machine (railway)` and not on the connected `Transfer for big garbage containers (large)`. This is a huge headache, since I can only store one type of garbage in it while the other types would be ignored. Then I tried using train lines instead with wait until full. That is also a problem, because I either not set which wagon waste type to collect and for some reason the game starts filling them all with one type and then they hang half filled while the remaining waste is not loaded and the truck never gets fully loaded neither. If I set the waste type myself, I would have to guess exactly the right amount of waste of each type is being generated. My last resort solution was to use a train for each waste type and make that train visit every zone and then dump on waste treatment zone, which kinda works but makes my trains travel a lot needlessly if that waste type is not that common.

One final note for a super weird behavior I found on the fertilizer. While the `Train Distribution Office` worked if I put trucks taking the fertilizer from the `Transfer for big garbage containers (large)` to the `Dump with claw machine (railway)`, the train would actually only load from the dump itself or from the factory production in realtime and never from the `Transfer for big garbage containers (large)` that actually bridges the two.

Screenshot[ibb.co]

So, anyway, how do you handle your waste? Do you know how I can fix my system?

Thanks!

Trains and waste are problematic. What works for me to avoid the most pressing issues the game has there - so only to use lines; avoid using the "wait to load/unload" checkboxes; avoid more than two stops; under all circumstances do not use lines for different types of waste or one type of waste and a type of cargo; do not use the advanced settings for cargo cars; do not load a waste type in buildings that have internal storage for different waste types, avoid selecting the waste type in the line menu; use setups in which a train can get stuck without causing a cascade of trouble by i.e. a road or different rail line, or train on the same line...
Assuming you have reliable train lines with good chunking that don't get gridlocked Trains are incredibly reliable and have much more capacity than trucks. (I recommend you also get the mod that lets you use high capacity dump trucks for mixed waste.) Make sure you have large storage buffers at every step and you can't really go wrong.
To answer OP question - RDO only loads what is in the rail-dump. It does not check nor see what it connected, it takes that building as a "storage".

Never heard of the fertiliser trick, not sure it works. I don´t use it.

The way that DOES work is simple: raildump is set to contain mixed waste. On the receiving (waste separation) end there is
- raildump -> general separation -> medium dump -> big incinerator -> big clawdump
(all dumps have "notify when overflowing" for safety reasons).
From there a DO takes clean ash to ash yard

Loading side is simple: either a raildump alone (rare), or accompanied with a local "preburner" (especially when hazmat is involved), so it is
- waste transfer (big) -> small incinerator -> raildump (mixed)

Then you need a single RDO with usually one train and a setting of "whenever a source raildump climbs above 50/60%, go and collect that mix and bring it to separation area".

This works and you can have one train (RDO) doing pickups from 3-4 locations easily.
......................

On the other hand - sort on source if possible. Construction waste where gravel is made or let it get put directly into an AGGREGATE storage next to your coal mine area, so it can get picked up (much faster, btw) as aggregate with an RDO and moved to processing. Same with scraps.

For example my iron mining side has a big aggregate loader (4 tracks) with 3 storages hooked onto it - iron (2000t), construction waste (1000t) and metal scrap (1000t). There are two long trains transporting iron from there to a steel mill (wait until loaded AND unloaded) as well as a single smaller train going
- load conwaste (wait till full)
-> go unload conwaste in gravel area (for recycling)
-> come back for metal scrap (load any)
-> go to steel mill to unload for recyclng
[-> start again]

Very simple, yet very effective. And rest of the waste goes via trucks to nearby big waste processing.
call me primitive.. but ive a mod dumpyard (verybig) for central conected to waste-powerhouse and a normal big wasteyard with crane. conected to others where the train picks it ups.. 4 stations to the central, train with (wait till full/wait till empty) he does his job.. just dont make the train to large..
usually i try to avoid Train Distribution Office .... maybe its just me but its tricky to use them good :D
< >
Showing 1-9 of 9 comments