DO load % setting breaks for waste transfer station behind road cargo station?
I've got a waste transfer station connected to a road cargo station to allow more trucks to load / unload, yet, for some reason, this breaks the percentage value to load at, set in the DO.

With the waste transfer station directly assigned to the DO, the percentages work accurately, even to single decimal points (6.5t of 97.5t from the small waste transfer station is 6.66%, setting the DO to load above 6.7% they won't load, but they will as expected when setting it to 6.6%, resulting in the large bin trucks running at full capacity).

This becomes an issue with the large bin trucks going for a pick up when a small bin truck dumps 0.5t of metal scrap or similar.

Any way to use road cargo stations with the large bin trucks utilizing their full capacity?

Thinking of just building multiple transfer stations dedicated to individual waste types instead to keep functionality.
Or maybe using multiple loading slot / one way modded ones.
< >
Showing 1-3 of 3 comments
Are you aware that you need the big waste trucks for the waste containers, and this garbage trucks for the small bins?
Yes, the small bin ones collect from the city and dump it into the waste transfer station using the connected road cargo station, all working fine here.
The DO has only large bin trucks, hence the issue of them departing for even tiny amounts if the road cargo station is set as the point to load from. The percentage setting does nothing, 0%, 1% 89% (which is max), a truck departs once a tiny bit of waste gets dropped in the transfer station. Which isn't the case when the transfer station itself is set up as a location to load from for the DO, then the percentage setting works as expected.

Hence my confusion why the road cargo station completely changes / breaks this behavior.
Originally posted by GrumpyOldMan:
[...]

Any way to use road cargo stations with the large bin trucks utilizing their full capacity?

[...]
Not that I know.

DOs are cool, but they are sensible to connections. For waste, you beter avoid load/unload station if you use DOs.

However, the big transfert station have two parking slots. If the road going to that transfert is long enought to queue some waiting trucks, you should have no problem.

If you still have capacities problems, the best solution, IMO, is to use more waste transferts.