Georgia State Route 26
SR 26 highlighted in red | ||||
| Route information | ||||
| Maintained by GDOT | ||||
| Length | 272.2Â mi[1]Â (438.1Â km) | |||
| Major junctions | ||||
| West end | ||||
| ||||
| East end | ||||
| Location | ||||
| Country | United States | |||
| State | Georgia | |||
| Counties | Chattahoochee, Marion, Schley, Macon, Houston, Pulaski, Bleckley, Laurens, Johnson, Emanuel, Bulloch, Bryan, Effingham, Chatham | |||
| Highway system | ||||
| ||||
| ||||
State Route 26 (SR 26) is a 272.2-mile-long (438.1 km) state highway that travels west-to-east through portions of Chattahoochee, Marion, Schley, Macon, Houston, Pulaski, Bleckley, Laurens, Johnson, Emanuel, Bulloch, Bryan, Effingham, and Chatham counties through the central part of the U.S. state of Georgia. It crosses nearly the entire width of the state, connecting Cusseta, on the southeastern edge of Fort Benning, near Columbus to Tybee Island on the Atlantic coast near Savannah, via Buena Vista, Ellaville, Oglethorpe, Hawkinsville, Cochran, Dublin, Swainsboro, Statesboro, and Savannah.
Route description
[edit]Chattahoochee to Houston counties
[edit]SRÂ 26 begins at an intersection with USÂ 27/USÂ 280/SRÂ 1/SRÂ 520 (South Georgia Parkway) in Cusseta, in the southeastern part of Fort Benning, in Chattahoochee County. Just over 1,000 feet (300Â m) later, it exits the base's border and crosses over a Norfolk Southern Railway line. It proceeds to the east on Clarke Duncan Highway and travels to the north of Chattahoochee County High School. SRÂ 26 crosses over a Norfolk Southern Railway line once again and re-enters Fort Benning for just over 1 mile (1.6Â km). At that point, the highway exits Fort Benning, Cusseta, and Chattahoochee County, and enters Marion County. South of Glen Alta, SRÂ 26 intersects the southern terminus of SRÂ 355 (Hatcher Road). Farther to the east, in Buena Vista, is an intersection with the southern terminus of SRÂ 41 Conn. (Baker Street). One block later, SRÂ 26 intersects the SRÂ 41 mainline (Broad Street). Just past the Short Street intersection, the roadway begins paralleling a Norfolk Southern Railway line to the southeast. The highway then enters Schley County. Around the northwestern city limits of Ellaville, SRÂ 26 and the Norfolk Southern Railway line take different paths to get to downtown. In downtown is an intersection with the northern terminus of SRÂ 153. The highway curves to the east-northeast direction. Just before leaving the city limits of Ellaville, SRÂ 26 intersects USÂ 19/SRÂ 3. After leaving town, it continues traveling to the east-northeast and enters Macon County. SRÂ 26 travels through rural areas of the county. Southwest of Oglethorpe, it intersects SRÂ 49. This intersection also marks the beginning of a concurrency with SRÂ 49 Truck. The two highways travel to the northeast on the OglethorpeâMontezuma Bypass, which crosses over a Norfolk Southern Railway line. Just after enter the city limits of Oglethorpe, the bypass ends, and SRÂ 26/SRÂ 49 Truck curves to the east-northeast. They cross over the Flint River and enter Montezuma. At South Dooly Street, southwest of the Flint River Community Hospital, SRÂ 49 Truck departs to the north-northwest, concurrent with SRÂ 90, which joins SRÂ 26 to the east. This intersection is on the northeastern edge of Macon County High School. At Vienna Road, SRÂ 90 departs to the southeast, and SRÂ 224 begins, concurrent with SRÂ 26. They cross over some railroad tracks of CSX on the John T. McKenzie Bridge. Just to the east of the entrance to Dr. C. P. Savage, Sr. Airport, SRÂ 224 departs to the north. A little over 5 miles (8.0Â km) farther to the east is the western terminus of SRÂ 329. SRÂ 26 travels to the northeast and curves back to the east just before entering Houston County.[1]
Houston to Laurens counties
[edit]SR 26 travels nearly due east and enters Henderson, where it intersects US 41/SR 7. East-southeast of there is an interchange with Interstate 75 (I-75) at exit 127. The highway travels south-southwest of Elko. It travels to the east and curves to the southeast. After a very brief segment along the HoustonâPulaski county line, it enters Pulaski County proper. SR 26 travels through rural areas of the county as Columbus Highway until it enters Hawkinsville. In the northwestern part of town, it intersects US 129/US 341/SR 11. SR 26 travels to the east-southeast on Commerce Street, until it intersects US 129 Bus./US 341 Bus./SR 11 Bus. (Progress Avenue). All four highways travel concurrently to the southeast, and then to the east-northeast, on Commerce Street. At Jackson Street, US 129 Bus./SR 11 Bus. leaves the concurrency, and SR 112 joins. Two blocks later, US 129 Alt., which travels along a southbound-only section of Commerce Street that meet the eastâwest part that US 341 Bus./SR 26/SR 112 travels on. The four highways travel to the south-southeast, skirting along the western edge of Veterans Memorial Park, until they intersect US 341/SR 27/SR 230/SR 257 (Broad Street). At this intersection, US 129 Alt.'s southbound lanes and US 341 Bus. both meet their southern terminus, and US 341/SR 27/SR 230/SR 257 joins the concurrency. The seven-highway concurrency travels to the east-southeast and crosses over the Ocmulgee River on the Roger H. Lawson Memorial Bridge. Approximately 0.5 miles (0.80 km) later, in Hartford, SR 230 departs to the south-southeast on Lower River Road, US 341/SR 27 travels to the southeast on Eastman Highway, and US 129 Alt./SR 26/SR 112/SR 257 travels nearly due north on Cochran Highway. About 100 feet (30 m) later, they begin to curve to the northeast and pass northwest of the HawkinsvilleâPulaski County Airport. The concurrency begins a curve to a more north-northeast routing, and SR 257 departs the concurrency on Chicken Road. A few miles later, the concurrency enters Bleckley County. After US 129 Alt./SR 26/SR 112 enters Cochran, they intersect US 23 Bus./SR 87 Bus. (2nd Street). At this intersection, US 129 Alt./SR 112 turns left onto the business routes, while SR 26 continues into downtown. Just past Cedar Hill Cemetery is an intersection with the western terminus of SR 126 (Chester Road). Approximately 2,000 feet (610 m) later, the highway intersects US 23/SR 87. SR 26 then travels northwest of Bleckley County Elementary School and Uchee Trail Country Club. The highway travels through rural areas of the county and enters Laurens County.[1]
Laurens to Bryan counties
[edit]Approximately 2.5 miles (4.0Â km) after entering the county, SRÂ 26 has an interchange with I-16 at exit 39. The highway then enters Bender, where it intersects USÂ 80/SRÂ 19. The three highways travel concurrently to the east. USÂ 80 and SRÂ 26 are concurrent for the rest of their length. In Dudley, the concurrency intersects SRÂ 338 (2nd Street). The three highways travel south of the W. H. 'Bud' Barron Airport and enter Dublin just before they intersect USÂ 441 Byp./SRÂ 117. In the main part of the city, they intersect USÂ 441/SRÂ 29. At this intersection, SRÂ 19 departs the concurrency to the south, while SRÂ 29 joins. The concurrent highways circle around the Laurens County Superior Court. At Washington Street, USÂ 319/SRÂ 31 also joins the concurrency. The five highways cross over the Oconee River on the Herschel Lovett Bridge and enter East Dublin. USÂ 319/SRÂ 31 departs the concurrency to the northeast on Wrightsville Avenue. Almost immediately after that, SRÂ 29 departs the concurrency to the southeast on Soperton Avenue. USÂ 80/SRÂ 26 crosses over a Norfolk Southern Railway line and travel through rural areas of the county before entering Johnson County. USÂ 80/SRÂ 26 travels through Scott and then enters Adrian. Just east of Kelly Street, they enter Emanuel County. In the main part of town, they intersect SRÂ 15/SRÂ 78 (Poplar Street). Immediately afterward, the concurrency crosses back into Johnson County. They curve to a north-northeast direction and cross over the Ohoopee River on the William H. Brantley Jr. Bridge and re-enter Emanuel County. The concurrent highways curve to the east-southeast and make a gradual curve to the northeast. They intersect USÂ 221/SRÂ 171 before crossing over the Little Ohoopee River. Just prior to entering the city limits of Swainsboro, they intersect USÂ 1/SRÂ 4/SRÂ 57. Immediately to the east of the intersection, they enter Swainsboro and are known locally as West Main Street. At Tyson Street, SRÂ 56 joins the concurrency through the city. Approximately 0.8 miles (1.3Â km) later, they intersect USÂ 1 Bus./SRÂ 4 Bus. (Main Street). After crossing over a Norfolk Southern Railway line, SRÂ 56 departs the concurrency. USÂ 80/SRÂ 26 curves to the east-southeast and enters Twin City. There, they have intersections with SRÂ 192 (5th Avenue) and SRÂ 23 (North Railroad Avenue). They travel through George L. Smith State Park and intersect SRÂ 121 just before entering Bulloch County. After traveling through Portal, USÂ 80/SRÂ 26 intersects USÂ 25/SRÂ 67 in Hopeulikit. The four highways travel concurrently to the southeast, toward Statesboro. Just before entering the city limits, they intersect the northern terminus of USÂ 25 Byp./SRÂ 67 Byp. (Veterans Memorial Parkway), a partial bypass of the city. In the main part of Statesboro, they intersect USÂ 301/SRÂ 73 (North Main Street). At this intersection, USÂ 25/SRÂ 67 departs the USÂ 80/SRÂ 26 concurrency. The two highways curve to the southeast and pass Eastside Cemetery just before intersecting the southern terminus of SRÂ 24 (East Main Street). Approximately 3,000 feet (910Â m) before leaving the city limits, they intersect USÂ 301 Byp./SRÂ 73 Byp. (another segment of the Veterans Memorial Parkway). USÂ 80/SRÂ 26 travels through Brooklet, to the east of Southeast Bulloch High School. In Stilson, they intersect the northern terminus of SRÂ 119 Conn. They travel to the southeast and have a brief concurrency with SRÂ 119 just before entering Bryan County.[1]
Bryan to Chatham counties
[edit]USÂ 80/SRÂ 26 enters Blitchton, where they intersect USÂ 280/SRÂ 30. At this intersection, USÂ 280 meets its eastern terminus, while SRÂ 30 joins the concurrency. The three highways cross over the Ogeechee River into Effingham County. After traveling through Eden, they cross over the Little Ogeechee River. Just before entering Chatham County, they intersect SRÂ 17. At this intersection, SRÂ 30 departs the concurrency, and SRÂ 17 joins it. USÂ 80/SRÂ 17/SRÂ 26 enters Bloomingdale. There, they have an intersection with the Jimmy DeLoach Parkway where SRÂ 17 departs. In Pooler, the concurrent highways have an interchange with Pooler Parkway and then the eastbound and westbound lanes split into one-way streets. The lanes come back together just before the interchange with I-95 at exit 102. Along the PoolerâGarden City city line is an intersection with SRÂ 307 (Dean Forest Road). After crossing over some Norfolk Southern and CSX railroad lines, they intersect the southern terminus of SRÂ 26 Conn (Burnsed Boulevard). USÂ 80/SRÂ 26 curves to the southeast and enter Savannah, paralleling I-516/SRÂ 21/SRÂ 25 (W.F. Lynes Parkway). Farther to the southeast, they intersect SRÂ 25 Conn. (West Bay Street). USÂ 80/SRÂ 25 Conn./SRÂ 26 travels south-southwest on Collins Street, then turn left onto Augusta Avenue, to travel southeast to a partial interchange with I-516/SRÂ 21/SRÂ 25. Here, SRÂ 25 Conn. meets its southern terminus. A short distance later, I-516/USÂ 80/SRÂ 21/SRÂ 25/SRÂ 26 crosses over various railroad tracks and have an incomplete interchange with West Gwinnett Street. Almost immediately is an interchange with I-16/USÂ 17 (Jim Gillis Historic Savannah Parkway). At this point, USÂ 17 joins the concurrency. A short distance later, the concurrency crosses over some railroad tracks of CSX and have an incomplete interchange with Tremont Road. At Ogeechee Road, USÂ 17/SRÂ 25 departs the concurrency to the southwest, while USÂ 80/SRÂ 26 departs to the northeast. The two highways cross over some railroad tracks of CSX and have an incomplete interchange with Stiles Avenue. They turn right onto Victory Drive. At Abercorn Street, they intersect the former SRÂ 204. They skirt along the northeastern edge of Daffin Park. They meet the Harry S. Truman Parkway at an interchange. Then, they leave Savannah and travel through Thunderbolt, crossing over the Wilmington River and the Intracoastal Waterway. They cross over Gray Creek and then intersect the western terminus of Johnny Mercer Boulevard, the path of former SRÂ 367. USÂ 80/SRÂ 26 also meets Islands Expressway, part of their former routing in the area. They have an intersection with the eastern terminus of Johnny Mercer Boulevard. Then, they cross over the Bull River and enter the property of the Fort Pulaski National Monument. USÂ 80/SRÂ 26 curves to the southeast and passes the entrance to the fort. The concurrency enters Tybee Island and meet their eastern terminus, an intersection with Butler Avenue (which continues after the terminus), Tybrisa Street, and Inlet Avenue.[1]
National Highway System
[edit]The following portions of SRÂ 26 are part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense:
- From its western terminus in Cusseta to the interchange with I-16 southeast of Montrose[2]
- The portion between USÂ 441 Byp./SRÂ 117 and USÂ 441/SRÂ 29 in Dublin[2]
- From the western end of the USÂ 25/SRÂ 67 concurrency in Hopeulikit to the USÂ 301 Byp./SRÂ 73 Byp. intersection in Statesboro[2]
- From the I-95 interchange in Pooler to an indeterminate point in Tybee Island[2][3]
History
[edit]1920s
[edit]SRÂ 26 was established at least as early as 1919 from SRÂ 1 in Cusseta through Buena Vista, Ellaville, Oglethorpe, Montezuma, Unadilla, Hawkinsville, Cochran, Dublin, Adrian, Swainsboro, Metter, and Statesboro, and ended in Savannah.[4] By the end of 1921, SRÂ 23 was extended onto the GraymontâMetter segment. SRÂ 46 was established on a more northern path between Graymont and Statesboro.[4][5] By the end of 1926, USÂ 80 was designated on SRÂ 26 from a point west-southwest of Dublin to Graymont and from Statesboro and Savannah, as well as on SRÂ 46 between Graymont and Statesboro. The entire Chatham County portion had a "completed hard surface". The entire Bryan County portion had a "completed semi hard surface". Five segments had a "sand clay or top soil" surface: from Oglethorpe to Montezuma; a segment southwest of the BleckleyâLaurens county line; from the west end of the USÂ 80 and SRÂ 19 concurrencies to Dublin; the GraymontâMetter segment; and from Statesboro to the BullochâBryan county line. The entire Effingham County portion was indicated to be under construction.[5][6] By the end of 1929, a portion east of Swainsboro had a completed hard surface. Four segments had a sand clay or top soil surface: nearly the entire Marion County portion of the CussetaâBuena Vista segment; a small portion on the MarionâSchley county line; a portion west-northwest of Graymont; and from just southwest of Statesboro to the approximate location of Stilson. Three segments of SRÂ 26 were indicated to be under construction: from Dublin to just east of the JohnsonâEmanuel county line; a portion east-southeast of Graymont; and nearly the entire MetterâStatesboro segment. A portion of USÂ 80/SRÂ 46 east-southeast of Graymont was also under construction, while nearly the entire Bulloch County portion of its path between Graymont and Hopeulikit had a sand clay or top soil surface.[6][7]
1930s
[edit]By the middle of 1930, an unnumbered road was built from Savannah to the northeastern part of Tybee Island. The OglethorpeâMontezuma segment of SRÂ 26 had a completed hard surface. Three segments of the highway had a sand clay or top soil surface: the entire Marion County portion of the CussetaâBuena Vista segment; a portion just west of the MarionâSchley county line; and from the CandlerâBulloch county line to Statesboro. From Graymont to the CandlerâBulloch county line, the highway was under construction.[7][8] By the end of the year, from Dublin to just west of the LaurensâJohnson county line, it had a completed hard surface. From Graymont to the EffinghamâChatham county line, it had a sand clay or top soil surface. From just east of the EmanuelâBulloch county line to Statesboro, it was indicated to be under construction. Also, the SavannahâTybee Island road was under construction.[8][9] By the end of 1931, USÂ 80's eastern terminus was truncated to Blitchton. Its old path on SRÂ 26 was redesignated as part of USÂ 280. Three segments had a completed hard surface: from Swainsboro to Graymont; from Statesboro to the approximate location of Stilson; and from the BullochâBryan county line to Savannah, as well as the Graymont to Statesboro segment of USÂ 80/SRÂ 46 and the SavannahâTybee Island road. Three segments were indicated to be under construction: a segment northeast of Hawkinsville; a segment west-southwest of Dublin; and from the approximate location of Stilson to the BullochâBryan county line.[9][10] In January 1932, SRÂ 26 was shifted north onto the GraymontâStatesboro segment of USÂ 80. SRÂ 46 was shifted onto the MetterâStatesboro segment. The StatesboroâBlitchton segment had a completed hard surface.[10][11] In March, a portion west of Hawkinsville was under construction.[12][13] The next month, a portion northwest of Buena Vista had a sand clay or top soil surface.[13][14] By the end of July, a portion of the highway northeast of Hawkinsville also had this type of surface.[14][15] In August, the Emanuel County portion of the DublinâAdrian segment was under construction.[15][16] The next month, two segments were under construction: a portion east-northeast of Ellaville and nearly the entire HendersonâHawkinsville segment.[16][17] In October, from the west end of the USÂ 80 and SRÂ 19 concurrencies to Dublin, the highway had a completed hard surface. Nearly the entire Pulaski County portion of the HendersonâHawkinsville segment had completed grading, but no surface course. A portion east-southeast of Buena Vista was under construction.[17][18] By the end of April 1933, the entire Johnson County portion had a completed hard surface. The Schley County portion of the EllavilleâOglethorpe segment had a sand clay or top soil surface. The Marion County portion of the Buena VistaâEllaville segment had completed grading, but was not surfaced. Two segments were indicated to be under construction: the Houston County portion of the HendersonâHawkinsville segment and a portion west-southwest of Swainsboro.[18][19] In May, a small portion east of the SchleyâMacon county line was under construction.[19][20] In September, the Emanuel County portion of the DublinâSwainsboro segment had completed grading, but was not surfaced.[21][22] The next month, nearly the entire Macon County portion of the EllavilleâOglethorpe segment also had this type of treatment.[22][23] In March 1934, the Emanuel County portion of the DublinâSwainsboro segment had a sand clay or top soil surface. A segment of the highway southeast of Buena Vista to west of Ellaville was under construction.[24][25] Later that year, SRÂ 26 was extended from Savannah to Tybee Island. Two segments had a completed hard surface: the Marion County portion of the Buena VistaâEllaville segment and from east of Adrian to Swainsboro. The Pulaski County portion of the HendersonâHawkinsville segment had a sand clay or top soil surface. The portion of the highway from the JohnsonâEmanuel county line to a point east of Adrian was under construction.[25][26] Before the year ended, two segments had a completed hard surface: nearly the entire Marion County portion of the CussetaâBuena Vista segment and the Emanuel County portion of the DublinâSwainsboro segment. Also, the Pulaski County portion of the HendersonâHawkinsville segment had a completed semi hard surface.[26][27] In the first quarter of 1935, nearly the entire Chattahoochee County portion of the CussetaâBuena Vista segment had completed grading, but was not surfaced.[27][28] By the middle of the year, nearly the entire Pulaski County portion of the HendersonâHawkinsville segment had a completed hard surface. A portion east of Montezuma had completed grading, but was not surfaced. The central part of the Macon County portion of the MontezumaâHenderson segment was under construction.[28][29] By October, two segments were indicated to be under construction: the Schley County portion of the EllavilleâOglethorpe segment and a portion northeast of Hawkinsville.[29][30] By the end of the year, SRÂ 26 was shifted to a more direct path between Cusseta and Buena Vista. The eastern part of the former path was redesignated as an extended SRÂ 103. From Cusseta to the new SRÂ 103 intersection had completed grading, but was not surfaced. The segment from Ellaville to Oglethorpe had a completed hard surface.[30][31] Late in 1936, two segments had a completed hard surface: from Buena Vista to Ellaville and from Henderson to Hawkinsville. From Cusseta to the SRÂ 103 intersection, the highway had a sand clay or top soil surface. Two segments were under construction: a portion northeast of Cochran and a small portion in Chatham County (east-southeast of the EffinghamâChatham county line).[32][33] About a year later, nearly the entire Macon County portion of the MontezumaâHenderson segment had a completed hard surface.[34][35] By the end of the year, USÂ 80 was extended from Blitchton to Tybee Island. USÂ 80/USÂ 280/SRÂ 26 was indicated to enter the western part of Savannah on Louisville Road. USÂ 280 ended at USÂ 17/SRÂ 25 (Montgomery Street). USÂ 80/SRÂ 26 turned right onto USÂ 17/SRÂ 25. They turned left onto 37th Street, right onto Bull Street, and left onto Victory Street.[35][36] By the middle of 1939, the Bleckley County portion of the HawkinsvilleâCochran segment had completed grading, but was not surfaced.[37][38]
1940s to 1960s
[edit]In early 1940, the HawkinsvilleâCochran segment had a completed hard surface.[39][40] By the end of the next year, USÂ 280's eastern terminus was truncated to Blitchton.[41][42] In 1942, the Laurens County portion of the CochranâDublin segment was under construction.[42][43] The next year, a small portion at the western terminus had a completed hard surface. Also, the Laurens County portion of the CochranâDublin segment had completed grading, but was not surfaced.[43][44] By the end of 1946, USÂ 17/USÂ 80/SRÂ 25/SRÂ 26 was indicated to enter Savannah on Bay Street. They turned right onto Montgomery Street. USÂ 17/SRÂ 25 and USÂ 80/SRÂ 26 split at the 37th Street intersection. USÂ 80/SRÂ 26 then continued as before.[45][46] By the middle of 1950, the CochranâDublin segment was hard surfaced.[47] In 1953, the CussetaâBuena Vista segment was also hard surfaced.[48][49] By June 1954, SRÂ 17 was extended onto USÂ 80/SRÂ 26 to Tybee Island (then called Savannah Beach).[49][50] By June 1955, USÂ 17/USÂ 80/SRÂ 17/SRÂ 25/SRÂ 26 was split onto one-way streets. USÂ 17 north/USÂ 80 west/SRÂ 17 north/SRÂ 25 north/SRÂ 26 west used Montgomery Street, while USÂ 17 south/USÂ 80 east/SRÂ 17 south/SRÂ 25 south/SRÂ 26 east used West Broad Street. USÂ 80 east/SRÂ 17 south/SRÂ 26 east turned left onto 37th Street and resumed their previous path.[50][51] Between June 1960 and June 1963, USÂ 80/SRÂ 17/SRÂ 26 no longer turned onto 37th Street and Bull Street. They turned directly onto Victory Street.[52][53] By the end of 1965, SRÂ 17 was truncated to a point west of Savannah.[53][54] In 1967, USÂ 80 Toll was established on Bay Street, President Street Extension, and Islands Expressway from USÂ 17/USÂ 80/SRÂ 25/SRÂ 26 to USÂ 80/SRÂ 26 in Whitemarsh Island.[55][56]
1980s to 2010s
[edit]In 1982, USÂ 80 Toll was decommissioned.[57][58] In 1985, I-516 was designated on SRÂ 21 from the west end of the freeway to just west of Montgomery Street. USÂ 17/SRÂ 25 was designated on SRÂ 21 from the west end of the freeway to Ogeechee Road. USÂ 80/SRÂ 26 was designated on SRÂ 21 from Bay Street to Ogeechee Road. Upon departing I-516/SRÂ 21, USÂ 80/SRÂ 26 traveled on USÂ 17S to Abercorn Street, where USÂ 17S ended.[59][60] The next year, USÂ 17S was decommissioned.[61][62] In 1995, USÂ 17 was shifted off of I-516/USÂ 80/SRÂ 21/SRÂ 25/SRÂ 26 north of I-16 and onto I-16 and SRÂ 404 Spur.[63][64] In 2017, it was planned to extended Jimmy DeLoach Parkway from its current southern terminus at USÂ 80/SRÂ 17/SRÂ 26, partially along the path of Bloomingdale Road (from SRÂ 17's current southern terminus at I-16 to just south of its intersection with the northern terminus of Pine Barren Road). Construction on the extension began in 2018.[65]
Future
[edit]The at-grade intersection at Jimmy DeLoach Parkway's current southern terminus is to be converted into a full diamond interchange. The extension of the parkway is planned to be designated as SRÂ 1251 until it is opened. The former alignment of SRÂ 17 is planned to be redesignated as SRÂ 17 Conn. Also, the eastern end of Osteen Road, which lies on the right-of-way of the extension, is to be shifted to the west.[65]
Major intersections
[edit]| County | Location | mi[1] | km | Exit | Destinations | Notes |
|---|---|---|---|---|---|---|
| Chattahoochee | Cusseta | 0.0 | 0.0 | Western terminus | ||
| Marion | â | 8.6 | 13.8 | Southern terminus of SRÂ 355 | ||
| Buena Vista | 16.7 | 26.9 | Southern terminus of SRÂ 41 Conn. | |||
| 16.8 | 27.0 | |||||
| Schley | Ellaville | 31.3 | 50.4 | Northern terminus of SRÂ 153 | ||
| 32.0 | 51.5 | |||||
| Macon | Fountainville | 41.3 | 66.5 | Eastern terminus of SRÂ 240 | ||
| â | 41.9 | 67.4 | Coogle Road east to SRÂ 128Â / SRÂ 90Â â Oglethorpe, Reynolds | Western terminus of Coogle Road, former SRÂ 214 east | ||
| â | 46.1 | 74.2 | Western end of SRÂ 49 Truck concurrency | |||
| Montezuma | 49.7 | 80.0 | Eastern end of SRÂ 49 Truck concurrency; western end of SRÂ 90 concurrency | |||
| 50.4 | 81.1 | Eastern end of SRÂ 90 concurrency; western end of SRÂ 224 concurrency; western terminus of SRÂ 224 | ||||
| 51.0 | 82.1 | John T. McKenzie Bridge over CSX railroad tracks | ||||
| â | 51.3 | 82.6 | Eastern end of SRÂ 224 concurrency | |||
| â | 56.5 | 90.9 | Western terminus of SRÂ 329 | |||
| Houston | Henderson | 65.2 | 104.9 | |||
| â | 66.5 | 107.0 | I-75/SRÂ 401 exit 127 | |||
| Pulaski | Hawkinsville | 84.1 | 135.3 | |||
| 84.3 | 135.7 | Western end of USÂ 129 Bus./SRÂ 11 Bus. and USÂ 341 Bus. concurrencies | ||||
| 84.4 | 135.8 | Eastern end of USÂ 129 Bus./SRÂ 11 Bus. concurrency; western end of SRÂ 112 concurrency; southern terminus of USÂ 129 Alt. | ||||
| 84.8 | 136.5 | Western end of USÂ 129 Alt. concurrency; both roadways are on one-way streets that meet. | ||||
| 85.0 | 136.8 | Eastern end of USÂ 341 Bus. concurrency; western end of USÂ 341/SRÂ 27, SRÂ 230, and SRÂ 257 concurrencies | ||||
| 85.1 | 137.0 | Roger H. Lawson Memorial Bridge over the Ocmulgee River | ||||
| Hartford | 85.8 | 138.1 | Eastern end of USÂ 341/SRÂ 27 and SRÂ 230 concurrencies | |||
| â | 87.1 | 140.2 | Eastern end of SRÂ 257 concurrency | |||
| Bleckley | Cochran | 95.2 | 153.2 | Eastern end of USÂ 129 Alt. and SRÂ 112 concurrencies | ||
| 96.3 | 155.0 | Western terminus of SRÂ 126 | ||||
| 96.7 | 155.6 | |||||
| â | 101.2 | 162.9 | Southern terminus of SRÂ 278 | |||
| Laurens | â | 112.3 | 180.7 | I-16/SRÂ 404 exit 39 | ||
| Bender | 113.5 | 182.7 | Western end of USÂ 80 and SRÂ 19 concurrencies | |||
| Dudley | 116.2 | 187.0 | ||||
| â | 121.8 | 196.0 | ||||
| Dublin | 126.3 | 203.3 | Eastern end of SRÂ 19 concurrency; western end of SRÂ 29 concurrency | |||
| 126.5 | 203.6 | Western end of USÂ 319/SRÂ 31 concurrency | ||||
| Oconee River | 127.1 | 204.5 | ||||
| East Dublin | 128.4 | 206.6 | Eastern end of USÂ 319/SRÂ 31 concurrency | |||
| 128.5 | 206.8 | Eastern end of SRÂ 29 concurrency | ||||
| EmanuelâJohnson county line | Adrian | 145.9 | 234.8 | |||
| Emanuel | â | 152.7 | 245.7 | |||
| â | 160.0 | 257.5 | ||||
| Swainsboro | 161.3 | 259.6 | Western end of SRÂ 56 concurrency; former SRÂ 57 west (Kite Road) | |||
| 162.1 | 260.9 | Former SRÂ 57 east (South Main Street) to USÂ 1 | ||||
| 162.6 | 261.7 | Eastern end of SRÂ 56 concurrency | ||||
| Twin City | 172.2 | 277.1 | ||||
| 173.0 | 278.4 | |||||
| â | 180.2 | 290.0 | ||||
| Bulloch | Hopeulikit | 191.7 | 308.5 | Western end of USÂ 25/SRÂ 67 concurrency | ||
| Westchester | 196.1 | 315.6 | Northern terminus of USÂ 25 Byp./SRÂ 67 Byp. | |||
| Statesboro | 198.2 | 319.0 | Eastern end of USÂ 25/SRÂ 67 concurrency | |||
| 199.1 | 320.4 | |||||
| 200.5 | 322.7 | |||||
| Stilson | 215.6 | 347.0 | Northern terminus of SRÂ 119 Conn. | |||
| Bryan | Ellabell | 223.2 | 359.2 | Western end of SRÂ 119 concurrency | ||
| 223.4 | 359.5 | Eastern end of SRÂ 119 concurrency | ||||
| Blitchton | 228.0 | 366.9 | Western end of SRÂ 30 concurrency; eastern terminus of USÂ 280; former western end of USÂ 280 concurrency | |||
| Effingham | â | 234.9 | 378.0 | Eastern end of SRÂ 30 concurrency, western end of SRÂ 17 concurrency | ||
| Chatham | Bloomingdale | 236.9 | 381.3 | Eastern end of SRÂ 17 concurrency; current western terminus of Jimmy DeLoach Parkway;[65] northern terminus of SRÂ 17 Conn.; diamond interchange | ||
| 237.5 | 382.2 | Cherry Street south | Former eastern end of SRÂ 17 concurrency | |||
| Pooler | 239.5 | 385.4 | Interchange | |||
| 241.4 | 388.5 | I-95/SRÂ 405 exit 102 | ||||
| Garden City | 244.3 | 393.2 | ||||
| 246.6 | 396.9 | Chatham Parkway south / Heidt Street north â Chatham County Administrative Complex | Northern terminus of Chatham Parkway; southern terminus of Heidt Street; former SR 167 south | |||
| 247.7 | 398.6 | Southern terminus of SRÂ 26 Conn.; erroneously signed as "To SRÂ 25 Conn." as well | ||||
| 247.9 | 399.0 | Main Street north | Former USÂ 17 north / SRÂ 25 north | |||
| Savannah | 248.7 | 400.2 | Western end of SRÂ 25 Conn. concurrency; former USÂ 17/SRÂ 21/SRÂ 25 south/USÂ 80/SRÂ 26 east | |||
| 248.9 | 400.6 | Eastern end of SRÂ 25 Conn. concurrency; western end of I-516/SRÂ 21/SRÂ 25 concurrency; eastern terminus of SRÂ 25 Conn.; no eastbound access to I-516 west; I-516/SRÂ 21/SRÂ 421 exit 7A | ||||
| 249.7 | 401.9 | 6 | Gwinnett Street â Amtrak station | Westbound exit and eastbound entrance; exit numbers follow I-516/SR 21/SR 421. | ||
| 249.9 | 402.2 | 5 | Western end of USÂ 17 concurrency; I-16/SRÂ 21/SRÂ 421 exits 164A-B | |||
| 250.7 | 403.5 | 4 | Tremont Road | Westbound exit and eastbound entrance | ||
| 251.3 | 404.4 | Eastern end of I-516/SRÂ 21/SRÂ 25 and USÂ 17 concurrencies; I-516/SRÂ 21/SRÂ 421 exit 3 | ||||
| 252.5 | 406.4 | Stiles Avenue | No westbound exit; interchange; former USÂ 17 Alt. north/SRÂ 25A north | |||
| 253.6 | 408.1 | Martin Luther King Jr. Boulevard | Former USÂ 17S | |||
| 253.7 | 408.3 | Montgomery Street | Former USÂ 17N | |||
| 254.1 | 408.9 | Abercorn Street | Former SRÂ 204 | |||
| 255.9 | 411.8 | Harry S.Truman Parkway | Interchange | |||
| Whitemarsh Island | 259.0 | 416.8 | Johnny Mercer Boulevard east / Shipwatch Road north | Western terminus of Johnny Mercer Boulevard; southern terminus of Shipwatch Road; former US 80 east / SR 367 east | ||
| 260.1 | 418.6 | Islands Expressway west | Partial interchange; western end of Islands Expressway portion | |||
| Turner Creek | 261.3 | 420.5 | Bridge; eastern end of Islands Expressway | |||
| Talahi Island | 262.7 | 422.8 | Johnny Mercer Boulevard | Former USÂ 80 west / SRÂ 367 west | ||
| Tybee Island | 272.2 | 438.1 | Eastern end of USÂ 80 concurrency; eastern terminus of USÂ 80 and SRÂ 26; eastern end of Butler Avenue portion; northern terminus of Inlet Avenue | |||
1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi
| ||||||
Special routes
[edit]Hawkinsville spur route
[edit]| Location | Hawkinsville |
|---|---|
| Existed | 1965[53][54]â1991[66][67] |
State Route 26 Spur (SR 26 Spur) was a spur route of SR 26 that existed in the central part of Hawkinsville. It was entirely in the central part of Pulaski County. Between June 1963 and the end of 1965, it was established and paved from US 129 north/US 341 south/SR 27/SR 230/SR 257 (Broad Street) to US 129 south/US 341 north/SR 26 (Commerce Street).[53][54] Between the beginning of 1984 and the beginning of 1992, SR 26 Spur was decommissioned and redesignated as US 341 Truck/SR 230 Truck.[66][67]
The entire route was in Hawkinsville, Pulaski County.
| mi | km | Destinations | Notes | ||
|---|---|---|---|---|---|
| Southern terminus | |||||
| Northern terminus | |||||
| 1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi | |||||
Hartford connector route
[edit]| Location | Hartford |
|---|---|
| Existed | 1965[53][54]â1991[66][67] |
State Route 26 Connector (SR 26 Conn.) was a connecting route of SR 26 that existed in Hartford in the central part of Pulaski County. Between June 1963 and the end of 1965, it was established from US 129/US 341 north/SR 26/SR 27 south/SR 257 to US 341/SR 27. It was entirely concurrent with US 341 north/SR 27.[53][54] Between the beginning of 1984 and the beginning of 1992, it was decommissioned.[66][67]
The entire route was in Hartford, Pulaski County.
| mi | km | Destinations | Notes | ||
|---|---|---|---|---|---|
| Western terminus; west end of USÂ 341/SRÂ 27 concurrency | |||||
| Eastern terminus; east end of USÂ 341/SRÂ 27 concurrency | |||||
| 1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi | |||||
Garden City connector route
[edit]| Location | Garden City |
|---|---|
| Length | 0.2Â mi[68]Â (320Â m) |
| Existed | 1985[69][70]âpresent |
State Route 26 Connector (SR 26 Conn.) is a 0.2-mile-long (0.32 km) connector route that exists entirely within the north-central part of Chatham County. The entire route is in the northeastern part of Garden City. It is known as Burnsed Boulevard for its entire length.
It begins at an intersection with USÂ 80/SRÂ 26. The highway curves to the north-northeast until it meets its northern terminus, an interchange with I-516/SRÂ 21/SRÂ 25.[68]
The entire length of SRÂ 6 Conn. is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense.[3]
Between the beginning of 1977 and the end of 1985, SRÂ 26 Conn. was established on its current path.[69][70]
The entire route is in Garden City, Chatham County.
| mi[68] | km | Destinations | Notes | ||
|---|---|---|---|---|---|
| 0.0 | 0.0 | Southern terminus | |||
| 0.1â 0.2 | 0.16â 0.32 | No access from I-516 westbound to SRÂ 26 Conn.; northern terminus; I-516/SRÂ 21/SRÂ 25 exit 8; SRÂ 25 takes on the Burnsed Boulevard name. | |||
1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi
| |||||
Savannah loop route
[edit]This section needs expansion. You can help by adding missing information. (October 2013) |
| Location | Savannah |
|---|---|
| Length | 8.5Â mi[71]Â (13.7Â km) |
| Existed | 1963[52][53]â1978[72][73] |
State Route 26 Loop (SR 26 Loop) was a loop route that existed entirely within the central part of Chatham County. Most of it was in the city limits of Savannah. All of its routing was later used for the route of I-516.[59][61]
Between June 1960 and June 1963, SRÂ 26 Loop was established and paved on DeRenne Avenue from Montgomery Street to southeast of Savannah. It was proposed to be built from USÂ 17/USÂ 80/SRÂ 17/SRÂ 25/SRÂ 26 on the northwestern edge of Savannah south-southwest to just south of USÂ 17/SRÂ 25 and then east-southeast to Montgomery Street.[52][53] By the end of 1965, it was proposed to be extended from DeRenne Avenue/La Roche Avenue north-northeast to USÂ 80/SRÂ 26 west-northwest of Thunderbolt.[53][54] In 1966, the loop was under construction from Augusta Avenue to Liberty Parkway. It was completed from Liberty Parkway to Montgomery Street.[54][55] The next year, the segment from Liberty Parkway to I-16 was indicated to "open spring '68".[55][56] In 1968, SRÂ 26 Loop was open from I-16 to Liberty Parkway.[56][74] In 1970, the loop was open from Augusta Avenue to I-16. It was proposed to be extended to USÂ 17/USÂ 80/SRÂ 25/SRÂ 26 southeast of Fair Street.[75][76] In 1977, this extension was open.[77][72] In 1978, it was redesignated as part of an eastern extension of SRÂ 21.[72][73]
Savannah connector route
[edit]| Location | Savannah |
|---|---|
| Existed | 1969[74][75]â1985[59][61] |
State Route 26 Connector (SR 26 Conn.) was a connecting route of SR 26 that existed in the central part of Chatham County. It was in the western part of Savannah. Between the beginning of 1945 and the end of 1946, US 17/SR 25 entered Savannah from the southwest on Ogeechee Street. They turned right onto 37th Street and left onto US 80/SR 26 (Montgomery Street).[45][46] In 1953, US 17/SR 25's northbound and southbound lanes split. Their northbound lanes traveled on Mills B. Lane Boulevard, 52nd Street, and curved left onto Montgomery Street.[48][49] Between June 1963 and the end of 1965, SR 25 Spur was designated on US 17's northbound lanes. SR 25 only traveled on US 17's southbound lanes.[53][54] In 1969, it was redesignated as SR 26 Conn.[74][75] In 1985, the connector was decommissioned.[59][61]
Whitemarsh IslandâWilmington Island loop route
[edit]| Location | Whitemarsh IslandâWilmington Island |
|---|---|
| Existed | 1965[53][54]â1969[74][75] |
State Route 26 Loop (SR 26 Loop) was an eastâwest loop route of SR 26 that was located in the east-central part of the state. It was completely within Chatham County in the Savannah metropolitan area. Between June 1963 and the end of 1965, it was established from US 80/SR 26 in Whitemarsh Island, then southeast over Turner Creek, then northeast and north-northeast to US 80/SR 26 in Wilmington Island. Its entire length was hard surfaced.[53][54] In 1969, it was redesignated as SR 367.[74][75]
Savannah Beach spur route
[edit]| Location | Savannah Beach |
|---|---|
| Existed | 1965[53][54]â1969[74][75] |
State Route 26 Spur (SR 26 Spur) was a spur route of SR 26 that existed in two parts in Savannah Beach, what Tybee Island was known as at the time. Between June 1963 and the end of 1965, the western segment of SR 26 Spur was established between two intersections with US 80/SR 26 in the northern part of the city. It traveled on North Campbell Avenue, Van Horne Avenue, Taylor Street, Meddin Drive, Cedarwood Avenue, another segment of Van Horne Avenue, and 2nd Avenue. An eastern segment was established from US 80/SR 26 east-southeast to SR 26 Loop in the southern part of the city.[53][54] In 1969, both segments of the spur route were decommissioned.[74][75]
The entire route was in Savannah Beach, Chatham County.
| mi | km | Destinations | Notes | ||||
|---|---|---|---|---|---|---|---|
| Western terminus | |||||||
| Eastern terminus | |||||||
| Gap in route | |||||||
| Western terminus | |||||||
| Eastern terminus | |||||||
| 1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi | |||||||
Savannah Beach loop route
[edit]| Location | Savannah Beach |
|---|---|
| Existed | 1965[53][54]â1969[74][75] |
State Route 26 Loop (SR 26 Loop) was a loop route of SR 26 that existed in the eastern part of Chatham County, in Savannah Beach, which is what Tybee Island was known at the time. Between June 1963 and the end of 1965, it was established between two intersections with US 80/SR 26 in the southern part of the city.[53][54] In 1969, it was redesignated as SR 26E.[74][75]
The entire route was in Savannah Beach, Chatham County.
| mi | km | Destinations | Notes | ||
|---|---|---|---|---|---|
| Western terminus | |||||
| Eastern terminus | |||||
| 1.000Â mi = 1.609Â km; 1.000Â km = 0.621Â mi | |||||
See also
[edit]References
[edit]- 1 2 3 4 5 6 "Overview map of SRÂ 26 (Cusseta to Cochran)" (Map). Google Maps. Retrieved December 29, 2013.
"Overview map of SRÂ 26 (Cochran to Statesboro)" (Map). Google Maps. Retrieved December 29, 2013.
"Overview map of SRÂ 26 (Statesboro to Tybee Island)" (Map). Google Maps. Retrieved December 29, 2013. - 1 2 3 4 National Highway System: Georgia (PDF) (Map). Federal Highway Administration. May 8, 2019. Retrieved September 18, 2019.
- 1 2 National Highway System: Savannah, GA (PDF) (Map). Federal Highway Administration. May 9, 2019. Retrieved September 18, 2019.
- 1 2 State Highway Department of Georgia (1920). System of State Aid Roads as Approved Representing 4800 Miles of State Aid Roads Outside the Limits of the Incorporated Towns (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (1921). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (October 1926). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (October 1929). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (June 1930). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (November 1930). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (January 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- â State Highway Department of Georgia (February 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- â State Highway Department of Georgia (March 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (April 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (May 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (August 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (September 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (October 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (November 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (May 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (June 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (September 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (October 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (November 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (March 1934). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (AprilâMay 1934). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (October 1, 1934). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (January 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (April 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (July 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (October 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (January 1, 1936). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 22, 2017.
- â State Highway Department of Georgia (July 1, 1936). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- â State Highway Department of Georgia (October 1, 1936). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- â State Highway Department of Georgia (July 1, 1937). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- 1 2 State Highway Department of Georgia (October 1, 1937). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 21, 2017.
- â Georgia State Highway Board (January 1, 1938). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 21, 2017.
- â State Highway Department of Georgia (September 1, 1938). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 21, 2017.
- â State Highway Department of Georgia (July 1, 1939). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 21, 2017.
- â State Highway Department of Georgia (January 1, 1940). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 22, 2017.
- â State Highway Department of Georgia (April 1, 1940). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 22, 2017.
- â State Highway Department of Georgia (July 1, 1941). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (January 1, 1942). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 22, 2017.
- 1 2 State Highway Department of Georgia (January 1, 1943). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017.
- â State Highway Department of Georgia (January 1, 1944). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017.
- 1 2 State Highway Department of Georgia (January 1, 1945). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017.
- 1 2 State Highway Department of Georgia (1946). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to November 7, 1946.)
- â State Highway Department of Georgia (1949). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to April 1, 1949.)
- 1 2 State Highway Department of Georgia (January 1, 1953). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017. (Corrected to January 1, 1953.)
- 1 2 3 State Highway Department of Georgia (1953). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to September 1, 1953.)
- 1 2 State Highway Department of Georgia (1954). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to June 1, 1954.)
- â State Highway Department of Georgia (1955). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to June 1, 1955.)
- 1 2 3 State Highway Department of Georgia (1960). State Highway System and Other Principal Connecting Roads (PDF) (Map) (1960â1961Â ed.). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to June 1, 1960.)
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 State Highway Department of Georgia (1963). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLCÂ 5673161. Retrieved April 24, 2017. (Corrected to June 1, 1963.)
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 State Highway Department of Georgia (January 1966). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- 1 2 3 State Highway Department of Georgia (January 1967). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- 1 2 3 State Highway Department of Georgia (January 1968). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1982). Official Highway and Transportation Map (PDF) (Map). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1983). Official Highway and Transportation Map (PDF) (Map) (1983â1984Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- 1 2 3 4 Georgia Department of Transportation (1984). Official Highway and Transportation Map (PDF) (Map) (1984â1985Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1984). Official Highway and Transportation Map (PDF) (Map) (1984â1985Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- 1 2 3 4 Georgia Department of Transportation (1986). Official Highway and Transportation Map (PDF) (Map) (1986â1987Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1987). Official Highway and Transportation Map (PDF) (Map) (1987â1988Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1995). Official Highway and Transportation Map (PDF) (Map) (1995â1996Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- â Georgia Department of Transportation (1996). Official Highway and Transportation Map (PDF) (Map) (1996â1997Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- 1 2 3 "Surface Transportation Block Grant (STBG) Urban Attributable (Z230) Funds" (PDF). Savannah Metropolitan Planning Commission. January 2017. Retrieved May 13, 2020.
- 1 2 3 4 Georgia Department of Transportation (1984). General Highway Map: Pulaski County, Georgia (Map). Atlanta: Georgia Department of Transportation â via GDOT Maps.
- 1 2 3 4 Georgia Department of Transportation (1992). General Highway Map: Pulaski County, Georgia (Map). Atlanta: Georgia Department of Transportation â via GDOT Maps.
- 1 2 3 "Overview map of SRÂ 26 Conn" (Map). Google Maps. Retrieved September 18, 2019.
- 1 2 Georgia Department of Transportation (1977). General Highway Map: Chatham County, Georgia (Map). Atlanta: Georgia Department of Transportation â via GDOT Maps.
- 1 2 Georgia Department of Transportation (1986). General Highway Map: Chatham County, Georgia (Map). Atlanta: Georgia Department of Transportation â via GDOT Maps.
- â "Overview map of SRÂ 26 Loop" (Map). Google Maps. Retrieved October 25, 2013.
- 1 2 3 Georgia Department of Transportation (January 1977). Official Highway Map (PDF) (Map) (1977â1978Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- 1 2 Georgia Department of Transportation (January 1978). Official Highway Map (PDF) (Map) (1978-79Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
- 1 2 3 4 5 6 7 8 9 State Highway Department of Georgia (January 1969). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- 1 2 3 4 5 6 7 8 9 State Highway Department of Georgia (January 1970). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- â State Highway Department of Georgia (January 1971). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved April 24, 2017.
- â Georgia Department of Transportation (January 1977). Official Highway Map (PDF) (Map) (1977â1978Â ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved April 24, 2017.
External links
[edit]
Media related to Georgia State Route 26 at Wikimedia Commons- Georgia Roads (Routes 21 - 40)
- State highways in Georgia (U.S. state)
- Transportation in Chattahoochee County, Georgia
- Transportation in Marion County, Georgia
- Transportation in Schley County, Georgia
- Transportation in Macon County, Georgia
- Transportation in Houston County, Georgia
- Transportation in Pulaski County, Georgia
- Transportation in Bleckley County, Georgia
- Transportation in Laurens County, Georgia
- Transportation in Johnson County, Georgia
- Transportation in Emanuel County, Georgia
- Transportation in Bulloch County, Georgia
- Transportation in Bryan County, Georgia
- Transportation in Effingham County, Georgia
- Transportation in Chatham County, Georgia
- Transportation in Columbus, Georgia
- Dublin micropolitan area, Georgia
- Roads in Savannah, Georgia
